Overhead Absorption Rates (Cambridge International A-Level Accounting)
Calculation of overhead absorption rates
Spec point — the causes and the calculation of under absorption and over absorption of overheads
How do I calculate the overhead absorption rates?
-
Overhead absorption rates (OAR) are calculated differently for machine-intensive departments and labour-intensive departments:
-
For machine-intensive departments:
-
For labour-intensive departments:
-
How do I calculate the overheads absorbed?
-
Overheads absorbed is the portion of overhead allocated to the product or service
-
For machine-intensive departments:
-
For labour-intensive departments:
Worked Example Machinery depreciation: $20 000
Total machine hours: 2 000 hours
Calculate the overhead absorption rate.
Answer:
20 000 ÷ 2 000 = 10
Final answer: OAR is $10 per hour
Under-absorption & over-absorption
What is under-absorption?
-
Under-absorption occurs when the actual overheads exceed the overheads absorbed
-
This can be caused by:
- actual expenditure being higher than the budgeted expenditure
- actual production being lower than budgeted production
What is over-absorption?
-
Over-absorption occurs when the overheads absorbed exceed the actual overheads
-
This can be caused by:
- actual expenditure being lower than the budgeted expenditure
- actual production being higher than budgeted production
How can under-absorption and over-absorption be calculated?
-
Under-absorption and over-absorption can be calculated by:
-
- If the result is positive then under-absorption has occurred
- If the result is negative then over-absorption has occurred
-
Worked Example Budgeted overheads = $50 000
Budgeted machine hours = 10 000 hours
Actual machine hours worked = 9 000 hours
Actual overheads incurred = $48 000
Calculate and determine whether under-absorption or over-absorption has occurred.
Answer:
- Calculate the OAR $50 000 ÷ 10 000 = $5 per machine hour
- Calculate the overheads absorbed $5 × 9 000 = $45 000
- Actual overheads - Overheads absorbed $48 000 - $45 000 = $3 000
Final answer: Overheads are under-absorbed by $3 000
Was this revision note helpful?