Fixed Overhead Variances & Sub-variances (Cambridge International A-Level Accounting)
Fixed overhead variances
Spec point — how to calculate the following variances: – fixed overhead expenditure and volume – fixed overhead capacity and efficiency sub-variances
Fixed overhead variances
How to calculate the overhead variances?
-
Many of the formulas will use overhead absorption rates (OAR)
-
The OAR is calculated based on the budgeted information and not the actual
-
The total fixed overhead variance is the difference between the flexed budgeted cost and the actual cost for fixed overheads
-
It is split into two variances
-
Fixed overhead expenditure variance
- The variance due to the difference between the fixed budgeted and actual expenditure or spending
-
Fixed overhead volume variance
- The variance due to the difference between the flexed budgeted and fixed budgeted overhead costs
-
| Total fixed overhead variance | |
|---|---|
| What is the formula? | standard fixed overheads based on flexed budget - actual fixed overheads |
| What are the steps? | - Multiply the budgeted overhead per unit with the actual output - Find the actual overheads incurred - Find the difference between the two costs |
| When is it favourable? | The actual overhead cost is **less **than the standard overhead cost |
| Fixed overhead expenditure variance | |
| What is the formula? | standard fixed overheads based on fixed budget - actual fixed overheads |
| What are the steps? | - Find the** fixed budgeted** cost for overhead - Find the actual overhead cost |
| When is it favourable? | The actual overhead cost is **less **than the standard overhead cost |
| Fixed overhead volume variance | |
| What is the formula? | standard fixed overheads based on flexed budget - standard fixed overheads based on fixed budget If OAR is based on labour hours: standard OAR × (standard hours based on actual output - standard hours based on fixed output) If OAR is based on units: standard OAR × (actual units - fixed units) |
| What are the steps? | - Calculate the OAR by using the formula below - Divide the budgeted overheads by the budgeted labour hours or units - Calculate**** the standard hours or units based on flexed output - Calculate the standard hours or units based on fixed output - Find the difference between these values - The difference is then multiplied by the standard OAR |
| When is it favourable? | When the standard overheads based on the actual output is more than the standard overheads based on the budgeted output |
Sub-variances of fixed overhead volume variance
-
There are two sub-variances for the fixed overhead volume variance
-
The sum of these two sub variances will equal the fixed overhead volume variance
-
Fixed overhead capacity variance
- This compares the variance caused by the difference in budgeted and actual labour hours for the same output
-
Fixed overhead efficiency variance
- This variance looks at the difference in budgeted hours based on actual output and actual hours
-
| Fixed overhead capacity variance | |
|---|---|
| What is the formula? | standard OAR × (actual hours - standard hours) |
| What are the steps? | - Calculate the OAR by using the formula below - Divide the budgeted overheads by the budgeted labour hours - Calculate the standard hours based on budgeted units - Calculate the actual hours based on actual units - Find the difference of budgeted and actual hours - Multiply the difference with the standard OAR |
| When is it favourable? | The actual hours are more than the **budgeted **hours |
| Fixed overhead efficiency variance | |
| What is the formula? | standard OAR × (standard hours based on actual output - actual hours) |
| What are the steps? | - Calculate the OAR by using the formula below - Divide the budgeted overheads by the budgeted labour hours - Calculate**** the standard hours based on actual output - Calculate the actual hours based on actual units - Find the difference of budgeted and actual hours - Multiply the difference with the standard OAR |
| When is it favourable? | The actual hours used are less than the standard hours based on the same level of actual output |
Exam Hint Remember to calculate the OAR using the standard costing information and not the actual information.
The OAR can be based on labour hours, material or units.
What are the possible causes of variances?
- Unexpected changes to machine or labour hours
- Better machines can reduce the OAR per machine hour
- Better skilled labours will need fewer hours to complete the work, therefore reducing the OAR per labour hour
Worked Example Brakes Ltd make brake pads. Here is the annual budgeted and actual information:
Budgeted Actual Production (units) 10 000 12 000 Fixed overheads ($) 150 000 160 000 Direct labour hours per unit 30 minutes 45 minutes Calculate:
(i) fixed overhead expenditure variance
(ii) fixed overhead volume variance
(iii) total fixed overhead variance
(iv) fixed overhead capacity sub-variance
(v) fixed overhead efficiency sub-variance
Answer:
(i) Fixed Overhead Expenditure Variance
Use the formula
- standard fixed overheads based on fixed budget - actual fixed overheads
- It is adverse as the overall actual cost is more than the budgeted cost
$150 000 - $160 000
Final answer: $10 000 Adverse
(ii) Fixed Overhead Volume Variance
Calculate the OAR per labour hour based on standard costing
\begin{gathered} \frac{Budgeted overheads}{Total \text{labour} hours} \\ = \frac{\ 150 000}{( 10 000 \times 0.5 ) hours} \ = \frac{$ 150 000}{5 000 hours} \ = $ 30 \text{per} \text{labour} \text{hour} \end{gathered}$
Use the formula
- standard OAR × (standard hours based on actual output - standard hours based on fixed output)
- It is favourable as the actual hours is more
standard hours based on actual output = 12 000 × 0.5 hours = 6 000 hours
standard hours based on fixed output = 10 000 × 0.5 hours = 5 000 hours
$30 × (6 000 - 5 000)
Final answer: $30 000 Favourable
(iii) Total Fixed Overhead Variance
Combine the variances
Fixed overhead expenditure variance $10 000 ADV Fixed overhead volume variance $30 000 FAV Total fixed overhead variance $20 000 FAV Alternatively, you can use the formula
- standard fixed overheads based on flexed budget - actual fixed overheads
\text{standard} \text{cost} \text{per} \text{unit} = \frac{\ 150 000}{10 000} = $ 15$
(12 000 × $15) - ($160 000)
Final answer: $20 000 Favourable
(iv) Fixed Overhead Capacity Sub-variance
Find the actual hours
12 000 × 45 minutes = 9 000 hours
Use the formula
- standard OAR × (actual hours - standard hours)
- It is favourable because the actual hours used are more than expected
$30 × (9 000 - 5 000)
Final answer: $120 000 Favourable
(v) Fixed Overhead Efficiency Sub-variance
Use the formula
- standard OAR × (standard hours based on actual output - actual hours)
- It is adverse as the actual hours are more than the budgeted hours for the same level of output
$30 × (6 000 - 9 000)
Final answer: $90 000 Adverse
Point to note that the difference between the capacity and efficiency variances equal to the volume variance
Fixed overhead capacity variance $120 000 FAV Fixed overhead efficiency variance $90 000 ADV Fixed overhead volume variance $30 000 FAV
Was this revision note helpful?
Build on this topic